
Install a new furnace and associated utility room work
Full furnace replacement and installation including: - New furnace unit installation - Reused existing base - Associated drywall work - Drain and vent piping for the unit

Knock down and skim over heavy ceiling texture
Professional removal and resurfacing of heavy ceiling texture. - Knock down existing texture peaks - Skim coat entire surface to create a smooth finish - Estimated rate of $4-$6 per square foot

Fabricate and deliver quartz countertops
Independent fabricator quote for quartz countertops. - Includes fabrication/cutting of slabs - Includes $600 delivery fee - Does not include installation - Slabs upcharged by several hundred dollars

Pull and clean the hvac blower motor
Professional cleaning of the furnace or air handler blower assembly to improve system efficiency. - Pull blower motor and wheel assembly from the unit - Clean dust and debris from the blower wheel blades - Reinstall and test for proper operation

Drain a heating zone and cut baseboard piping
Professional service to prepare for joist repair including: - Depressurizing the hydronic heating system - Draining the specific heating zone - Cutting approximately five feet of baseboard piping near the 90-degree elbow to allow for structural work

Repair and clean 10-year old hvac system
Comprehensive cleaning and component replacement for indoor and outdoor units to address biological growth and mechanical wear. - Clean dirty ducts - Clean dirty blower and evaporator coil - Remediate biological growth (mold) inside the unit - Install UV light to prevent future mold growth - Replace failing starter/capacitor on outdoor condenser - Address compressor failing on start issues

Replace a/c unit with heater and water heater
Full replacement and installation of HVAC system and water heater including: - 2 TON 14.3 SEER-2 RUUD Air Handler and Condenser - 40 GAL SLIM ELECTRIC WATER HEATER WITH 6 YEAR WARRANTY - NEW LIFETIME PAD, DISCONNECT AND WHIP - Standard Registered Warranty (10 year) - Material & Labor - Other - Ruud - Required Permits

Build a 15x15 composite deck with metal railings and stairs
Construct a new composite deck including: - 15x15 deck dimensions - Metal railing system - Stairs with a mid-point landing for a split-level house - Excludes concrete slab work below the deck

Paint room over the phone estimate
Initial sight-unseen estimate for painting the room. - Based on pictures provided by homeowner

Seal the red balau deck
Seal the newly constructed red balau deck to protect the wood. - Application of sealant to deck surfaces - Labor and materials included

Perform duct cleaning for 30 runs
Full duct cleaning service for the entire ventilation system. - Includes cleaning for 30 duct runs - Intended to remove potential paint overspray or construction debris

Replace furnace control board
Professional replacement of the furnace control board following diagnosis. - Diagnose faulty control board - Supply and install new OEM or compatible control board - Labor for installation and testing
Browse quotes
Browse quotes from other homeowners and professionals to get a sense of what your project should cost.
Submit your own quote
Submit your own quote to get feedback from other homeowners and professionals.
Get peace of mind
Make informed decisions based on real market data and expert opinions.